Capital is the loss-absorbing layer that sits between a bank holding company (BHC) and failure. When unexpected losses arrive, capital absorbs them first, which keeps the firm lending to creditworthy households and businesses and shields the deposit insurance fund and, ultimately, taxpayers. For the largest firms, the way capital is managed and allocated matters for more than the firm itself, because their health feeds directly into the stability of the wider U.S. banking system.
The Capital Plan Rule issued by the Federal Reserve turns that concern into a legal requirement. Every U.S.-domiciled, top-tier BHC holding $50 billion or more in total consolidated assets must prepare and maintain a capital plan, and that plan must rest on a robust internal process for judging whether capital is adequate. The Federal Reserve calls this internal process the capital adequacy process, or CAP. The rule was implemented in 2011.
The supervisory programme that assesses these plans is the Comprehensive Capital Analysis and Review (CCAR), run annually. In 2013, CCAR covered the 18 BHCs that had taken part in the Supervisory Capital Assessment Program (SCAP) of 2009, while the plans of the remaining firms under the rule went through a separate Capital Plan Review. From 2014, all BHCs subject to the rule were to be assessed together in one unified CCAR process. The assessment looks at how a firm identifies, measures and manages risk, how it estimates stressed losses and revenues, and how well its governance and controls hold these practices together.
Why the amount of capital is not the whole story
Supervisors care about more than the size of the capital ratio on a given day. They want to see the internal policies and practices a firm uses to decide how much capital it needs and in what form, given its own exposures, its strategy and the regulatory standards it faces. A BHC whose ratios look comfortable today still needs a process that keeps them comfortable through a broad range of future economic and market conditions. That process works mainly by governing capital actions such as dividends, share repurchases, and share issuance or conversion.
Two cautions shape everything that follows. First, practices described as leading are not a safe harbor: expectations move as data improve, new products create new risks and estimation techniques advance. Second, the supervisory scenarios and the Dodd-Frank Act stress tests are an important part of CCAR, but they are not a complete map of the risks any particular BHC faces. A firm that designs its internal process simply to reproduce the Federal Reserve’s stress test is following a weak practice. Many of the lagging practices supervisors found came from generic assumptions or standard modelling choices adopted without asking whether they suited the firm’s own business.
The preamble to the Capital Plan Rule sets out the elements the Federal Reserve uses to judge whether a firm’s capital adequacy process is robust. They are usually presented as seven principles, and together they describe a chain: identify and measure risk, turn risk into stressed losses, estimate the resources available to absorb those losses, combine the two to see the effect on capital, set policy and act on the result, and wrap the whole chain in controls and governance.
| No. | Principle | What the BHC must be able to show | Where it is covered below |
|---|---|---|---|
| 1 | Sound foundational risk management | An infrastructure for measuring and managing risk that identifies, measures, assesses and controls every material risk from its exposures and activities | Risk identification |
| 2 | Effective loss-estimation methodologies | A way to convert risk measures into potential losses across a range of stressful scenarios, and to add those losses up across the firm | Loss estimation |
| 3 | Solid resource-estimation methodologies | A clear definition of available capital resources, including projected revenues, estimated over the same stressful scenarios used for losses | PPNR projection |
| 4 | Sufficient capital adequacy impact assessment | A process that brings losses and resources together and measures the combined effect on capital against the firm’s own goals for capital level and composition | Balance sheet, RWA and aggregation |
| 5 | Comprehensive capital policy and capital planning | Capital goals, decisions on appropriate capital levels and composition, decisions on capital actions, and capital contingency plans | Capital policy |
| 6 | Robust internal controls | Policies and procedures, change control, model validation and independent review, full documentation, and internal audit review | Internal controls |
| 7 | Effective governance | Board and senior management oversight, covering review of risk infrastructure and methods, evaluation of capital goals, appropriateness of scenarios, limitations and uncertainties, and approval of capital decisions | Governance |
A useful way to remember the list is to split it into three groups. Principles 1 to 4 are the analytical engine: they produce the numbers. Principle 5 is the decision layer: it says what the firm will do with those numbers. Principles 6 and 7 are the assurance layer: they make sure the numbers can be trusted and that the people who decide understand their limits. A weakness in any layer can lead supervisors to object to a capital plan, even when the projected ratios look adequate.
One of the clearest lessons of the financial crisis was that many firms simply did not see the exposures their activities had created. Fragmented systems played a part, but the deeper failure was conceptual: firms did not consider the full scale and scope of what they held, or how the size and riskiness of those positions could change once the economy turned. Capital planning only works when a complete picture of positions is combined with a credible view of how that picture evolves under stress.
What a sound identification process covers
The identification process should take in on-balance-sheet and off-balance-sheet positions, including exposures that would appear if the firm stepped in, with no contractual duty, to prop up off-balance-sheet entities, and risks that only appear when economic and market conditions change. It should be systematic and repeatable rather than a one-off exercise. Assumed risk reduction from hedges, guarantees, netting and collateral agreements also needs scrutiny: enforceability, effectiveness and the ability to access and value collateral can all weaken precisely when asset values are falling fast.
Stronger firms used a standard process through which senior management refreshed risk assessments regularly and asked how exposures might develop in different stressful situations. Many kept a risk inventory covering the whole firm, updated when the business mix or the operating environment changed, with input from finance, treasury, corporate risk management and the main business lines. Risk measures should pick up changes in the risk profile quickly, whether those come from new products, rising volumes, concentrations or portfolio quality, and the same measures can later serve as early warning indicators or contingency triggers.
Linking every risk to the capital plan
A BHC must be able to show where each identified risk is accounted for. If a risk is left out of the enterprise-wide scenario analysis, the firm should explain how it is captured elsewhere, and where non-scenario quantification methods are used, it should state which risks each method covers. Lagging firms could not make this link. In some, the capital planning staff worked in a silo and kept a separate risk inventory that was not connected to the firm-wide inventory.
Risks that are hard to quantify
A small number of discrete scenarios cannot capture everything a large firm faces. Reputational risk, strategic risk and compliance risk are examples of exposures that are difficult to measure or do not attach naturally to any one scenario. Where possible, their effect should be built into projected net income across the nine-quarter planning horizon, through lower revenue, higher expenses or a management overlay on losses, with the assumptions clearly supported.
Many firms instead held an extra cushion above their internal capital targets. That approach can be acceptable when the firm states which risks the cushion covers and how its size relates to them. Setting the cushion with a simple rule such as a fixed percentage of capital, or by unsupported expert judgment, is a lagging practice, and the weakest firms did not try to account for these risks at all.
Capital planning touches data systems, models, aggregation tools, reports and final decisions, so the control framework has to span the entire chain. Four control elements carry most of the weight: regular and comprehensive review by internal audit, independent model review and validation, comprehensive documentation including policies and procedures, and change controls. When parts of the process are built separately inside business lines, the control framework must make sure management reconciles those pieces into one coherent result.
The role of internal audit
Internal audit should periodically review the full end-to-end process, not only individual components, to confirm that it works as the board’s approved policies intend and as supervisors expect. It should also check how deficiencies are found, tracked and closed, and report regularly to senior management and the board on the state of capital planning, including any deficiencies in the capital plan itself. Leading firms gave audit staff strong technical skills, real stature inside the organisation, and independence from management, and they tracked issue remediation closely.
Independent model review and validation
Every model used in capital planning should be independently reviewed and validated in line with the Federal Reserve’s model risk guidance, SR 11-7. Validators need the technical competence to understand the models, enough standing to be heard, and independence from both the developers and the business. Validation has three parts:
- an assessment of conceptual soundness;
- ongoing monitoring, including process verification and benchmarking;
- outcomes analysis, which compares model output against what actually happens.
Firms should keep a model inventory that includes feeder models, which produce inputs for the models that generate final loss, revenue or expense numbers. A model built for normal business conditions may not be fit for estimating income and capital under stress, so suitability for stressed use must be considered explicitly. Outcomes analysis is hard for stress models because severe scenarios rarely occur, so firms should compensate through sensitivity analysis and challenger models that act as benchmarks. Validation should also cover management overlays, not only the raw models.
Supervisors found that model risk management generally needed more attention. The stronger firms kept their inventory current, confirmed that each model had been validated for the use it was put to, and were open about validation status, restricting unvalidated or weak models or checking them against challenger output. Lagging firms could not list all the models they used, left some high-impact stress models unreviewed, and lacked independent validators able to challenge the developers.
Policies and procedures should cover every stage of capital planning so that the process runs the same way each cycle and an outsider can see how it works. They should be refreshed at least annually, and sooner when circumstances call for it. There should be evidence that staff actually follow them, and exceptions should go through a formal route, stay rare, and be approved at the right level of management.
Protecting the integrity of reported results
Controls should exist at every level of the process so that reported results can be trusted and every material change to the process is documented, reviewed and approved. In particular, controls should make sure that:
- management information systems (MIS) can support capital analysis and decisions, and is flexible enough for ad hoc questions;
- key reports pass through reconciliation and data integrity checks;
- aggregated, firm-wide results disclose any manual adjustments made during aggregation and explain which weaknesses those adjustments are meant to offset;
- reports to senior management and the board are accurate, timely and suitably detailed, and state whether the firm is within its internal capital goals and targets, with any deviation explained, documented and approved.
Firms with stronger practices invested heavily in data controls. Some had internal audit check the data, and anything going to the board received extra cross-checking. Their MIS could gather, analyse and deliver information quickly and run ad hoc analysis without diverting large resources. Other firms still struggled with antiquated or siloed systems that did not talk to each other and needed substantial manual work to reconcile.
Documentation
Documentation should describe the risk measurement and management infrastructure, the loss and resource estimation methods, the way capital decisions are made, and how well the control and governance functions work. It needs enough detail to describe practice accurately, to let reviewers challenge it, and to give decision-makers the information they need.
The board of directors is ultimately responsible and accountable for overseeing capital planning, and the Capital Plan Rule requires the board to approve the capital plan. Together with senior management, the board should build a capital planning process that sits inside the firm’s wider risk management, matches its risk appetite framework, and fits its strategic direction. Governance covers periodic review of the risk infrastructure and the loss and resource estimation methods, evaluation of capital goals and targets, judgement on whether the stress scenarios are appropriate, regular review of limitations and uncertainties, and approval of capital decisions.
What the board should receive
To decide on capital adequacy and capital actions, including distributions, the board needs information at least quarterly, and sooner when something material changes capital adequacy or the way it is measured. That information should show capital measures under current conditions and on a post-stress, pro forma basis, both framed against the firm’s capital goals and targets. It should describe the scenarios in enough detail for the board to judge them against the economic outlook and the firm’s risk profile and strategy. It should also lay out the key limitations, assumptions and uncertainties, together with plans to mitigate them, so that directors can challenge the results before they decide and can apply extra caution where weaknesses exist.
Boards at stronger firms understood the risks and vulnerabilities driving capital adequacy and the main drivers of losses and revenues in each scenario. They had the expertise and engagement to question management, and they treated capital planning results as estimates within a range rather than precise answers. They also debated known weaknesses and asked whether enough stress events had been considered.
Board reporting in practice
Stronger reporting packages included the results of independent model validation, issues raised by internal audit, the key assumptions behind the stress results, and how sensitive capital levels were to those assumptions. Some also showed how past capital plans had performed, giving the board a view of the process over time. Weaker packages gave the board too little. At some firms, distribution recommendations lacked supporting analysis and seemed to rest on optimistic expectations about the scenario. At others, the board heard nothing about governance and controls over capital planning, so it could not judge whether the results deserved confidence.
Recording decisions
Decisions on capital adequacy and capital actions, and the information used to reach them, should be documented and retained under the firm’s policies. Strong board minutes recorded how a decision was made, what information was used, and how directors challenged management, including how they assessed management’s own challenge. Weak minutes were brief and opaque, and some firms did not formally document key decisions at all.
Senior management carries out the capital planning activities the board authorises and answers to the board for how well they work. That includes making sure effective controls surround the process and that the firm’s stress scenarios are severe enough and cover its material risks and vulnerabilities.
Management also shapes the decisions the board takes. It should bring informed recommendations on capital goals and distributions, backed by analysis and reflecting what creditors, counterparties, investors and supervisors expect. It is responsible for finding the weaknesses and limitations in the process, judging how material they are, and building remediation plans where they affect the reliability of results. Both the limitations and the remediation plans go to the board.
What stronger management teams did differently
At stronger firms, senior management accepted that forecasts of the future are imprecise and treated scenario results with that in mind. They assessed every area of capital planning continuously rather than relying on a single annual review, documented weaknesses, assumptions, limitations and uncertainties clearly, and set remediation plans with specific deadlines. In some cases, after reviewing the whole process, management made the plan more conservative, for example by recommending smaller capital actions. They also flagged key assumptions and process weaknesses explicitly to the board, sometimes with analysis showing how capital would change under alternative outcomes.
A BHC’s capital planning review finds three issues. The commercial real estate loss model was validated for normal conditions but not for stressed use. The deposit pricing assumption in the stress scenario is identical to the baseline. Board minutes from the last cycle record the approval of a buyback in a single line.
A capital policy is the set of principles and guidelines a BHC uses to plan capital, issue it, use it and distribute it. Under the rule it must contain internal capital goals, guidelines (quantitative or qualitative) for dividends and share repurchases, plans for dealing with a possible capital shortfall, and the internal governance procedures around the policy itself. As part of the capital plan, the policy must be approved by the board or a designated board committee.
The policy should be a separate, complete written document. It should connect to and draw support from related policies on risk management, stress testing, model governance and audit, and it should explain how the firm manages, monitors and decides on every part of capital planning, who makes which decisions, what process and data controls apply, and what validation standards are used. It should also spell out what the capital plan must contain.
Distributions and decision rules
The policy should state targets for capital level and composition and explain how the firm’s planning supports a strong capital position that lasts through severe stress. It should give quantitative metrics, such as common stock dividend payout ratios used as maximums or targets, and explain why management believes those ratios are appropriate, sustainable and consistent with the business model. It should name the capital metrics used in decisions and set out escalation protocols that are clear, credible and actionable if an actual or projected capital ratio breaks its target. On distributions specifically, the policy should cover:
- the factors and metrics that drive the size, timing and form of distributions;
- the analysis consulted before deciding, such as earnings reports and stress results;
- the situations in which the firm would cut or suspend a dividend or buyback;
- what the firm would weigh before replacing common equity with other forms of capital;
- who prepares the analysis, who reviews it, who recommends and who makes the final decision.
The policy should be re-examined at least annually and whenever defined triggers occur, such as changes in organisational or governance structure, strategy, capital goals, regulation or risk appetite. Approvals, change management and document retention for the policy should follow a formal process.
Weak policies were narrow. They covered only part of the process, gave too little detail to show how capital actions would actually be decided, were poorly connected to other risk and finance policies, or omitted required elements. Some were generic restatements of supervisory expectations with nothing specific to the firm, and in some firms the detailed procedures never reached the board.
A capital goal is the level and composition of capital the firm intends to keep so that it can carry on operating during and after a period of stress. Goals should match the firm’s risk appetite and risk profile and should reflect current and future regulatory requirements together with what shareholders, creditors, counterparties, rating agencies, supervisors and other stakeholders expect, both today and under stress.
A capital target sits above the goal. Its job is to create enough room that, when stress arrives, capital can fall without dropping below the goal. Setting the target means looking forward: at the economic outlook, the firm’s own financial condition, the possible effect of stress events, and the uncertainty built into any capital plan. Both goals and targets belong in the capital policy and need board review and approval.
Inputs to goals and targets
When setting goals and targets, and especially when deciding distributions, a firm should take account of general economic conditions and its plans to grow, whether organically or by acquisition, on and off the balance sheet. It should consider how external conditions, contingent exposures and market-wide or systemic events could push risk beyond its chosen tolerance and limit its ability to raise new capital, and it should have contingency plans for those outcomes. It should track several capital measures, some leverage-based and some risk-based, with regulatory ratios such as the tier 1 common ratio estimated every quarter under baseline and stress conditions.
Weak practice set goals only by reference to regulatory minimums and the ratios needed to be classed as well-capitalised, with no analysis of the firm’s own risk profile, business model, complexity and sensitivity to changing conditions. Other weaknesses were ignoring the uncertainty in loss and revenue projections, failing to link distribution decisions to capital metrics, and not explaining how goals and targets had been chosen.
A BHC sets a tier 1 common ratio goal of 8.0%, a target of 9.5% and an early-warning trigger at 10.0%. Its own stress scenario projects the ratio for the nine quarters as 11.2%, 10.6%, 10.1%, 9.7%, 9.4%, 9.2%, 9.3%, 9.5% and 9.8%.
The capital policy should list the actions the firm would consider to repair a current or expected shortfall in capital. In particular, it should explain in detail the circumstances under which the firm would cut or suspend a dividend or repurchase programme or drop a capital action it had planned. Those circumstances can stem from the wider economy, market conditions or the firm’s own financial condition.
How capital triggers work
The policy should translate those circumstances into a defined set of capital triggers and events. Triggers should exist for the baseline scenario and for the stress scenario, each compared with the capital target for that scenario. They act as an early warning that capital is deteriorating and should sit inside a decision framework with target ranges for normal operations and threshold levels that force management to act. Action can include escalation to the board, suspension of capital actions or activation of the capital contingency plan. The triggers also set how often the board and management revisit planned actions.
Triggers should not rely on capital ratios alone. Measures of the firm’s actual or perceived condition are useful too: liquidity, earnings, debt and credit default swap spreads, rating downgrades, share price performance, supervisory actions and general market stress. The plan itself should be reviewed when conditions change materially, for instance after a change in organisational structure, strategy, capital structure, credit quality or market access.
Making contingency actions realistic
Some ways of raising or preserving capital may not work in a crisis. Firms need a realistic view of how much the market can absorb before relying on debt or equity issuance or on asset sales. Contingency actions should be flexible, achievable under stress, and ranked by how easy they are to carry out and how much they help, with stakeholder reactions such as the effect on future capital raising taken into account.
Weak plans offered few options or ignored whether those options would work under stress. Overly optimistic plans, plans that leaned too heavily on past experience, and plans with no support for the feasibility of their actions were also judged weak. So were trigger sets based only on actual rather than projected results, and triggers based only on minimum regulatory ratios with no regard for creditors, counterparties, investors or market indicators.
The Capital Plan Rule requires each firm to use a stressed scenario it designs itself, suited to its business model and portfolios. The preamble to the rule says this scenario should reflect the company’s own vulnerabilities to macroeconomic, market-wide and firm-specific factors. So the scenario should be tailored to stress the firm’s key weaknesses and idiosyncratic risks, given its business model, asset and liability mix, geographic footprint, portfolio features and revenue drivers. A generic downturn about as deep as the supervisory severely adverse scenario falls short of this standard.
Observed approaches
Firms built scenarios in different ways: with internal models and expertise, with vendor-defined macroeconomic scenarios, or with vendor models used to construct customised paths. Among firms building their own scenarios, the stronger ones combined internal models with expert judgment instead of relying on either alone. Among firms using third-party scenarios, the stronger ones adapted them to their own risk profiles. Selection should involve risk experts, business managers and senior management. Although only one BHC stress scenario is submitted for CCAR, firms should maintain a suite of scenarios that together cover their material risks and use all of them in capital planning.
Severity and tailoring
Stronger firms tailored their scenarios creatively to risks the severely adverse scenario did not capture, such as the default of a major counterparty, a natural disaster or other operational event, or a sharper shock to a particular region, industry or asset class than the general macroeconomic stress. Scenarios should never contain assumptions that favour the firm. Some weak scenarios assumed the firm would look strong next to its rivals and gain market share, which defeats the purpose of the exercise.
Firms whose main vulnerability is not recession should add elements aimed at their real revenue and loss sources. Taken together, the recession and the added elements should create substantial stress, including a significant fall in capital ratios relative to baseline. Producing lower post-stress ratios than the supervisory severely adverse scenario is not, by itself, a safe harbor.
Variables and narratives
The scenario must include enough variables to drive pro forma projections for every material risk. A single business line can be stressed through several channels, so it may need more than one variable. Firms should choose variables through a consistent process and explain the choice in the narrative. Weak scenarios left out relevant variables: some firms with large trading businesses used only a few financial variables, and some with regional or industry concentrations had no geographic or industry variables.
A clear scenario narrative should explain how the scenario hits the firm’s particular vulnerabilities, how the variables relate to the risks in each major business line and, ideally, to the variables in internal risk models, and why the variable paths move together in an economically sensible way. Weak narratives gave no context for the variable paths or described features that no variable actually captured.
A capital plan must project losses, revenues, expenses, reserves and pro forma capital, covering the tier 1 common ratio, the minimum regulatory ratios and any other measure the firm considers relevant, across the horizon, both in the expected case and in several stressed scenarios. Loss, revenue and expense projections are the building blocks of this analysis. They should be credible, consistent with the scenario, grounded in empirical evidence, and produced by a transparent, repeatable process. The Federal Reserve expects models or other quantitative methods to be the usual basis, while accepting qualitative approaches where data are limited or products are new, provided those approaches are well supported and repeatable.
Data and segmentation
Internal data should normally drive the estimates. External data can make models more robust when internal history is thin because of system limits, acquisitions or new products, but the firm must check that the external data resemble its own portfolios and adjust for differences. There is no required method, but estimation should be granular enough to capture the main risk drivers and changing conditions. Loss models, for example, should be built at a segment level fine enough to reflect differences in risk and performance across segments and over time.
Firms often segment by business line or product. Leading practice is to segment by shared risk characteristics, such as credit score bands or loan-to-value bands, that show clearly different historical performance. A more varied portfolio needs more segments, but each segment must still have enough observations to support reliable estimates. Portfolios driven by different factors, or by the same factors in very different ways, should be modelled separately. Commercial real estate losses, for instance, respond much more strongly to property prices than commercial and industrial loan losses do, and even within real estate, income-producing loans and construction loans react differently. Lagging firms used risk drivers with no clear statistical or conceptual link to results.
Testing models built for stress
Stress models rest on many assumptions, and relationships between macroeconomic variables and losses may behave differently in a hypothetical scenario than in history. Out-of-sample comparisons remain useful but are not enough. Sensitivity analysis reveals which assumptions drive the results, and challenger models give a benchmark whose strengths may offset the primary model’s weaknesses. When several approaches are used, the firm needs a consistent way to compare them and a documented reason for its final choice.
Vendor and consultant models are acceptable if internal staff understand their design and limits, the firm tailors them to its portfolios, and they are validated under SR 11-7. One shortcut drew criticism: projecting an annual figure and spreading it evenly across the four quarters of each year. This ignores the real quarterly path of losses and revenue and is acceptable only when the item is highly uncertain and the shortcut is clearly conservative.
A model is not automatically better than judgment. Firms should not use a weak or badly specified model just so they can say an estimate is modelled. Most firms apply expert judgment somewhere, usually as a management overlay on model output that captures portfolio risks the model misses or compensates for model and data gaps. In limited cases, for example after a major business change or where relevant data do not exist, judgment can be the main method for a projection.
Conditions for using judgment
Judgment-based estimates face the same discipline as models. The process must be transparent and repeatable, the judgments must be supported, and the key assumptions must fit the scenario. Documentation should let an outside reviewer follow the reasoning and assess whether the outcome is reasonable. Overlays should be challenged, a range of estimates should be considered, and key assumptions should be tested for sensitivity. When a firm adjusts model output heavily, it should measure the effect of the adjustments against the unadjusted figures and share that comparison with management and the board. Extensive adjustment should also prompt a discussion of whether better models are needed. Reports to the board should always show both the original results and the adjusted results.
Conservatism and credibility
Because the exercise looks forward under great uncertainty, the Federal Reserve expects conservative assumptions throughout. Models should be built on data that include sufficiently bad outcomes. A firm that did better than its peers in past downturns should not assume that pattern will repeat; it should ask how history could turn against it in a severe stress.
All relevant loss events should be included unless the firm has truly left a business or is no longer exposed to that risk. Losses cannot be dropped on the argument that the business has changed, for example because old loans were underwritten to standards no longer used or came with an acquisition. Firms should not lean on favourable assumptions that cannot be assured in a stressed market, and they should not give themselves foresight. Some firms used knowledge of the scenario path to assume they would rebalance portfolios ahead of the downturn. In reality, management would not know how events would unfold, and the plan should reflect that uncertainty.
Documenting estimation practice
Good documentation names the drivers behind each method and keeps three things visibly apart: model outputs, qualitative overlays on those outputs, and purely qualitative estimates. Weak documentation was disorganised and leaned on unsupported judgment.
A good loss-estimation method begins with theory and then tests it. The firm should first establish that its explanatory variables have a sound theoretical link to losses, and only then show empirically that the relationship is strong. Most residential mortgage models, for example, use unemployment and a house price index, because these shape both the ability and the incentive of a borrower to keep paying. Firms often add portfolio-specific drivers, such as regional indicators, office vacancy rates or corporate profits, to the core scenario variables like GDP, unemployment and credit spreads, and any model producing those drivers needs full model risk treatment.
Portfolio losses are then summed through a repeatable process, which matters most when accounting-based and economic loss measures or different horizons are combined. Leading firms automated it so every figure could be traced back to source data, with overrides logged; lagging firms relied on opaque manual adjustments.
Data for retail and wholesale portfolios
Retail portfolios generally had rich internal loss data from the recent downturn, so external data were used mainly as a benchmark. Wholesale portfolios often had a short history of 5 to 10 years covering only one downturn, so some firms supplemented or calibrated with external data. Retail segments were typically defined by product and lien position plus risk features such as credit score, collateral type and loan-to-value ratio. Weak practice applied a single model across several portfolios without adjusting for the different risk drivers of each, such as industry, obligor type, collateral or lien position in wholesale lending.
The expected loss framework
Credit loss methods take either an accounting view (charge-offs and recoveries) or an economic view (expected losses); either is allowed, but the firm must understand how their loss timing differs and reflect that in quarter-end reserves. Under the expected loss approach, losses depend on three parameters.
Most firms modelled probability of default econometrically, conditioned on the macroeconomic path and on loan features, and leading firms found separate drivers for each parameter. Long-run averages of PD, LGD and EAD blend good and bad years, so they must not be used for stress projections.
Data on loss given default are scarcer. Leading firms tied LGD to its drivers, recognised collateral and guarantees, and allowed collateral values to fall under stress. Others used a simple conservative rule (for example 100 percent LGD for credit cards), crisis-period LGDs, or judgment-based scaling of historical averages, all acceptable when supported and benchmarked. Lagging firms used one weighted-average LGD for a whole portfolio or could not show LGD worsening with the scenario.
Few firms let exposure at default vary with the economy, mostly because of data gaps. Stronger firms captured drawdowns on unused lines through loan equivalent factors or credit conversion factors.
A revolving corporate credit portfolio has $600 million drawn and $400 million undrawn. Under the firm’s stress scenario, the loan equivalent factor is 45%, PD is 6% and LGD is 70%. The long-run averages are PD 2% and LGD 40%.
Weak practice ignored undrawn commitments or assumed committed lines could be cut during the stress.
For wholesale portfolios, many firms project a stressed rating transition matrix quarter by quarter and derive losses from it. The internal rating of each loan is moved through time in line with the scenario. The details differ between firms, but the common sequence has four steps, shown in Figure 2.
Picking matrices by judgment from past stress periods is weak practice, because the result may not match the scenario and the future need not copy the past. Sound transition models need two things: a long time series with enough upgrades and downgrades to avoid sparse matrices, and a granular, well-calibrated rating system. Firms often turned to third-party data, which is acceptable only if they show it mirrors their own portfolio’s migration. Weak firms had lumpy rating changes or concentrations in one or two grades, so their matrices barely reacted to the scenario and their losses looked more like long-run averages than severe stress.
Roll-rate models
A roll-rate model, common for retail portfolios, estimates the share of loans in each delinquency state that move to a worse state next period, so it is a close cousin of the transition model. Roll rates should be conditioned on scenario variables, and for states where statistical links are weak, such as late-stage delinquency, conservative assumptions should replace pure statistics. Roll-rate models are transparent and simple, but their predictive power fades beyond the near term, which limits them over the nine-quarter planning horizon. Combining a roll-rate model with another model for later quarters is generally weaker practice, as it can create jumps in projected losses; a firm that does it must show the switch is empirically justified, consistent and transparent.
A card portfolio has $10,000 million of current balances. Under the stress scenario, the quarterly roll rates are 2% from current to 30 days past due, 50% from 30 to 60 days, 60% from 60 to 90 days and 80% from 90 days to charge-off.
Vintage loss models
Vintage loss models, also called age-cohort-time models, group retail loans by origination cohort and quality segment, fit a baseline seasoning curve per segment, and then regress the losses at each age on macroeconomic variables. They suit products with life-cycle effects, such as auto loans, but are hard to build and validate, because vintage effects are difficult to separate from macroeconomic effects, and they tend to assume cohorts behave alike, which produces average-year rather than stressed results.
A minority of firms used net charge-off (NCO) models, either as the main loss model or as a benchmark. These regress portfolio-level charge-off rates on macroeconomic variables, often with lagged NCO rates as autoregressive terms. They usually ignore differences in sensitivity across segments and changes in portfolio risk over time, they explain less than driver-based models, and they assume that history predicts the future, which may fail in a scenario outside the portfolio’s experience. A firm should not use any model that misses changes in portfolio risk characteristics, and an NCO model without adequate segmentation should not be the primary approach for a material portfolio.
Scalar adjustments multiply a baseline loss estimate upward to produce a stressed figure, with the scalar calibrated from history, from stressed-to-baseline ratios in other portfolios, or from judgment. They are easy to build and explain but opaque and insensitive to portfolio composition and the scenario, so they should be used, at most, for immaterial portfolios.
Other-than-temporary impairment
Every credit-sensitive security, whether held-to-maturity (HTM) or available-for-sale (AFS), should be tested for other-than-temporary impairment (OTTI), whatever its current status. For structured products, the threshold should come from cash-flow and credit analysis of the underlying obligors, not from ratings alone. For direct obligations such as corporate bonds, most firms projected rating migration under stress and applied a rating-based threshold; holding ratings fixed over the horizon is weak practice. Methods should reflect accounting rules, respond to the scenario, and be independently validated for each class of security.
Leading firms used security-level and country-level data, modelled the credit risk of the loans beneath securitised products, kept judgment limited and documented, and recognised losses early in the horizon. Accounting rules cap OTTI at the unrealised loss, but some firms conservatively allowed projected OTTI to exceed it. Lagging firms tested only securities already impaired or rated below investment grade, or left out key drivers. One example is projecting losses on non-agency residential mortgage-backed securities with the unemployment rate but not the house price index, despite strong evidence that mortgage losses track housing prices.
The Capital Plan Rule does not require advanced measurement approach (AMA) models for stressed operational losses, and best practice here is still developing. Firms that already hold rich AMA data, however, should reuse that data and their risk tools for stress estimation, whatever method they choose. Operational risk models are built on loss events, meaning cases where the firm lost money, or was exposed to loss, because internal processes, people or systems failed or because of external events.
| Event type | Typical illustration |
|---|---|
| Internal fraud | An employee misappropriates client funds |
| External fraud | Card skimming or a forged cheque |
| Clients, products, and business practices | Mis-selling claims and related litigation |
| Employment practices and workplace safety | A discrimination or injury claim |
| Damage to physical assets | A flood destroys a branch |
| Business disruption and system failures | A core banking outage |
| Execution, delivery, and process management | A settlement or data entry error |
Internal loss data should be the starting point, with forward-looking elements, idiosyncratic risks and tail events added on top. Most firms also used external data, scaled to their own size and profile, and the scaling must be well supported. Few firms used business environment and internal control factors such as risk control self-assessments, which need not be model inputs but help in choosing scenarios.
Data quality and units of measure
Internal data collection should record the occurrence, discovery and accounting dates, the event type and the business line. Complete data should be used. Lagging firms left out big items, for example legal reserves and tax or compliance penalties, dropped losses from acquired institutions because they were hard to collect, or removed losses from discontinued businesses even when the events could recur elsewhere in the firm. Where acquisition data are missing, one fix is to scale existing internal data by size of operations and add an add-on to the relevant business lines or units of measure. Any exclusion or smoothing, especially of large losses, needs a documented rationale. Data should be split into units of measure granular enough to group similar losses while leaving enough observations; most firms used event type, some combined event type with business line.
Correlation with the economy and regression models
Many firms struggled to find links between macroeconomic factors and operational losses. Those that did usually had large data sets, often with external data, and found the link in loss frequency for certain event types, adjusting frequency distributions accordingly. Firms that found no link used other methods, such as scenario analysis layered on modelled results, which is acceptable if the estimates are conservative and consistent with the scenario.
Baseline operational losses typically came from the annual budgeting process or historical averages. For stress, most firms used a regression model, estimating frequency (number of losses) and loss severity (size of each loss). Severity rarely correlated with the economy, so firms typically paired a regressed frequency with a severity assumption drawn from the latest crisis, such as a static value or a four-quarter moving average. Most chose estimation periods and specifications by judgment rather than statistical evidence. Stronger firms combined several approaches, for example separate models for fraud or litigation and historical averages elsewhere, but very few had built benchmarks to challenge their main models.
AMA firms use the loss distribution approach (LDA) to estimate annual operational value at risk. For each unit of measure, a frequency distribution and a severity distribution are fitted to loss data and then combined, usually by Monte Carlo simulation, into a distribution of annual losses.
The AMA reads this distribution at the 99.9th percentile. For CCAR, firms adapted the LDA in one of two ways: they read it at a lower percentile, or they adjusted the frequency distribution in line with observed macroeconomic correlation. Firms taking the first route typically used the mean or median for baseline losses and percentiles between the 70th percentile and the 98th percentile for stress, sometimes varying the choice by event type. No percentile is mandated, but the selection must be credible and transparent, justified for the specific scenario, and tested with sensitivity analysis.
The simulated distribution in Figure 3 has a median of $95 million and a mean of $120 million, with 70th, 90th, 98th and 99.9th percentiles of $136 million, $228 million, $387 million and $785 million. The firm proposes the 90th percentile for its stress estimate.
Scenario analysis, historical averages and legal losses
Operational scenario analysis gathers structured views from business managers and risk experts on the likelihood and impact of plausible severe events. Firms used it to set a management overlay on modelled losses, covering idiosyncratic risks and events never experienced, and they must show the overlay’s effect on final estimates. The process needs clear definition and a credible rationale for each chosen scenario. Historical averages were used for event types with no macroeconomic link, and a few firms used them alone; on their own they look backward and miss unseen risks, so periods, thresholds and outlier treatment must be justified.
Legal exposure is a large share of operational losses at many firms, so it is often projected separately. All legal reserves and settled legal losses belong in the operational loss estimate. Methods include judgment-based add-ons, legal reserves, historical averages and regressions specific to the clients, products, and business practices category; for mortgage representations and warranties claims, some firms built hazard-rate models of default and repurchase claim rates.
Large trading books can lose heavily under stress through moves in interest rates, credit spreads, equity and commodity prices, and through counterparty credit risk if a trading counterparty weakens or defaults. Firms with more than $500 billion in total consolidated assets that are subject to the market risk rule must also apply the global market shock in their Dodd-Frank Act company-run stress tests.
Probabilistic vs deterministic approaches
A probabilistic approach produces a distribution of portfolio profit and loss and can expose loss-generating scenarios a fixed scenario would miss. It is complex and opaque, though, and because tail losses are hard to tie to specific scenarios, it is difficult for the board to see what actions would reduce them. Firms using it must show it can generate scenarios worse than history and explain how tail scenarios inform their view of idiosyncratic risk. A deterministic approach produces a point loss for a defined scenario. It is easier to communicate but may miss damaging scenarios, so firms must show they examined a range that stresses their key exposures. Most CCAR firms relied on deterministic methods, informed by statistical models of shock sizes and covariances, in a three-step process: design and select scenarios, translate them into risk-factor moves, and revalue and aggregate positions.
Scenario design and shocks
Scenarios should severely stress mark-to-market positions, especially where the firm has a large or dominant market share, and capture unusual basis risks in complex, interlocking positions. Copying the Federal Reserve’s global market shock may miss risks unique to the firm and can lead to a negative assessment. Most firms applied shocks instantaneously, as though moves that normally take days, weeks or months happened at once, which is suitably conservative given uncertainty about exiting positions. Very large shocks can produce implausible results such as negative risk-free or forward rates, so joint moves need a plausibility check, and departures from normal risk-factor mappings need documentation.
Revaluation, defaults and mitigants
Approximations that suit daily VaR can mismeasure large moves, so full revaluation should generally be used for stress testing, especially for nonlinear positions; approximations are acceptable only where tests show the error is small. Parameters that markets do not reveal, such as correlations for credit-default baskets, should be perturbed. Results should be explainable by position, asset class and risk type.
Defaults are usually estimated outside the market shock, with a model like the incremental risk charge using PD, LGD and EAD over a horizon such as the margin period of risk. Leading firms also simulated outright default by their biggest counterparties, one or several at a time. Any assumed hedging or selling during the stress must be conservative, consistent with policy, supported by experience and executable with high confidence; selling positions to other banks in a crisis may not be possible.
Pre-provision net revenue (PPNR) is revenue minus non-interest expense before credit provisions, and the rule requires it to be projected over the nine-quarter planning horizon under the same scenarios used for losses. Projections should reflect current positions and how the business might evolve under each scenario, use the same accounting basis as the capital ratios, and be granular enough to capture different revenue and expense drivers. Regulatory changes, such as changes to deposit insurance limits, may also stop history from repeating.
One coherent story per scenario
Assumptions on deposit growth, pricing, expense cuts and other management actions must fit the scenario and each other, and management should check that their timing is realistic. Loss, PPNR, balance sheet and RWA projections should tell a single consistent story. The same origination assumptions should drive loan balances, loan fees, origination costs and loan losses, and trading revenue should move with trading assets, liabilities and trading RWA.
Stronger firms had central planning, business lines and treasury working closely with real challenge. In some, the centre built independent projections to test the business line numbers; in others, the centre projected and the business lines challenged. Both beat a centre that merely added up others’ figures. These firms also chose revenue and expense segments by what actually drives them, not only by regulatory line items, while mapping internal conventions to the FR Y-14 schedules.
Common weaknesses
Lagging firms had no clear way to turn scenario conditions into revenue and expense, relied on opaque judgment, and showed results that clashed with the scenario. Data limits, unsupported assumptions and poor documentation were the most common problems. Adjusting a budget or baseline is acceptable only if the firm links the baseline to its conditions, justifies the stress overlay, and removes favourable strategic assumptions that would not survive stress. Weak models should not be used just to have a model; where models were weak, stronger firms used alternatives such as industry-level models combined with firm-specific market share assumptions. Some firms relied on data covering a single cycle, sometimes as few as 10 quarters, which cannot capture a downturn. Others assumed drastic cuts in origination or expenses in the severely adverse scenario without considering the longer-term effect on strategy.
Net interest income projections must use the same balance sheet as loss estimation and asset-liability management. Loan pricing should reflect the scenario and competitive factors, and deposit projections should reflect strategy and pricing. Methods should capture contractual terms and behaviour: prepayments, new business spreads, repricing as yield curves move, embedded options such as caps, floors and calls, and loans moving to nonperforming status in line with the loss estimates. Some firms allocated total loan losses across portfolios using today’s mix of nonperformance, ignoring how relative performance changes during the scenario. Stronger firms captured changes in discount or premium amortisation as payment speeds change, as FASB Statement No. 91 requires, and questioned whether a constant spread to an index was realistic.
Non-interest income should be projected at a level that captures its real drivers, sometimes with more than one method. Fee lines tied to the balance sheet should move with it, trading revenue should link to trading assets, liabilities and RWA, and the implied return on assets should be checked. Revenue tied to broad indices should use measured sensitivity, not an assumed perfect correlation. Mortgage servicing rights need scenario-dependent prepayment, delinquency and default assumptions driven by home prices, and realistic hedge outcomes. Weak practice included volume growth ignoring market saturation, identical strategies in baseline and stress, market share gains, revenue floors at historical levels, and regressing high-level revenue directly on the scenario instead of modelling drivers such as customer spending or assets under management.
A card issuer’s stress projection shows gross interchange revenue falling from $500 million to $410 million as consumer spending drops. It also assumes that marketing costs booked as contra-revenue fall from $150 million to $40 million.
Non-interest expense projections should allow for costs that rise in a downturn, such as other real estate owned and collections, including the staff and compensation they require, while recognising that some costs are controllable. Expense cuts must be attainable given asset levels and operating needs, supported by evidence, and timed realistically, allowing for contracts that cannot be changed. Assuming immediate, dramatic cuts to marketing, rewards or compensation without support is not acceptable and implies perfect foresight of the scenario.
Balance sheet projections drive losses, PPNR and risk-weighted assets, so they need a documented process. Balances depend on originations, purchases, sales, maturities, prepayments and defaults, but most firms projected balances directly for each major segment each quarter. Stronger firms modelled the drivers separately (contractual paydowns, prepayments, nonperformance and new business), checked each against the scenario, and used business line input to test implied behaviour. Most used asset-liability management software to tie balances, revenue and losses together; firms without it need another integrating process.
Favourable balance sheet assumptions need strong evidence. Examples include asset mix shifts that cut risk weights without matching changes in PPNR or losses, flight-to-quality deposit inflows that lower funding costs, large shrinkage with no loss on disposal, and improved operating margins.
Risk-weighted assets (RWA) must follow projected exposures and their risk attributes and match the scenario’s severity. Credit balances should be granular enough to apply regulatory risk weights. For trading exposures, scenario variables should feed the risk parameters, since RWA per dollar can rise when volatility rises. Firms using internal models should not assume RWA relief from future model or data improvements. All assumptions should be documented and independently reviewed.
Allowance for loan and lease losses
The allowance for loan and lease losses (ALLL) must stay adequate along the scenario path and at the horizon end, judged against the projected size, mix and risk of the loan book. Reserve builds and releases should be consistent with the scenario, credit quality, loss recognition method and balances. Methods that recognise losses late, such as NCO models, require extra reserves for losses still to come after the horizon. Top-down coverage approaches should benchmark their coverage ratios and loss-emergence periods against past stress and internal policy, explaining material differences.
Losses, PPNR, balance sheet and RWA estimates must be combined into post-stress capital ratios through a well-established, consistently run process. Effective firms gave this job to a central group that combines the projections, applies governance and controls, checks that components and totals are coherent, and documents every adjustment. The group should test whether loss and revenue paths fit the balance sheet, RWA and scenario. A rise in PPNR while balances shrink, for instance, needs investigation. Similar exposures in different business lines that react differently to the scenario should be traced to their cause, and a post-stress result better than baseline calls for a hard look at assumptions.
Strong aggregation used existing planning and reporting systems; standalone spreadsheets are weak unless backed by access and change controls, an audit trail and logged approvals. Results should reconcile to management and regulatory reports through a transparent mapping, and weak firms lacked such reconciliation and consistent application of assumptions.
Where firms still fall short
The central insight behind the Federal Reserve’s expectations is a forward-looking view of capital under severe stress: how revenue and losses could change, what vulnerabilities the business model creates, and a capital policy that governs actions in normal and stressed times. Despite progress since the crisis and since the rule took effect in 2011, every CCAR participant faced challenges in at least one area:
| Shortfall observed | Principle affected |
|---|---|
| Cannot show where every risk is captured in the plan | 1 |
| Scenarios and models ignore the firm’s particular vulnerabilities | 2 and 3 |
| Projections not robust, transparent or repeatable, or missing stress effects | 2, 3 and 4 |
| Capital goals and targets unclear, unsupported or too vague to guide action | 5 |
| Governance and controls, including basic risk management, below standard | 6 and 7 |